Inside of Island Federal Arena during the COVID-19 pandemic.
Inside of Island Federal Arena during the COVID-19 pandemic at Stony Brook University. A few people are pictured standing and seated in the arena. This location served as command center for construction of the Alternate Care Facilities (ACF) or field hospitals.Date: 2020-04-02 -
Construction of field hospitals in the athletic fields during the COVID-19 pandemic.
Construction of field hospitals in the athletic fields during the COVID-19 pandemic at Stony Brook University. Equipment is pictured is foreground and in background is the Kenneth P. LaValle Stadium.Date: 2020-04-02 -
Elevated view of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Elevated view of the Alternate Care Facility (ACF)/COVID-19 field hospital on the west campus at Stony Brook University. Pictured in the foreground is Kenneth P. LaValle Athletic Stadium and pictured in the background are tents constructed by the U.S. Army Corps of Engineers and Turner Construction. Pictured right is the Athletic Indoor Practice Facility.Date: 2020-04-10 -
Elevated view of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Elevated view of the Alternate Care Facility (ACF)/COVID-19 field hospital on the west campus at Stony Brook University. Pictured in the foreground is Kenneth P. LaValle Athletic Stadium and pictured in the background are tents constructed by the U.S. Army Corps of Engineers and Turner Construction. Pictured right is the Athletic Indoor Practice Facility.Date: 2020-04-10 -
Interior view of a field hospital tent under construction.
Interior view of a tent constructed by the U.S. Army Corps of Engineers and Turner Construction, part of the Alternate Care Facility (ACF)/COVID-19 field hospital on the west campus at Stony Brook University.Date: 2020-04-10 -
Interior view of a field hospital tent under construction.
Interior view of a tent constructed by the U.S. Army Corps of Engineers and Turner Construction, part of the Alternate Care Facility (ACF)/COVID-19 field hospital on the west campus at Stony Brook University.Date: 2020-04-10 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
South-facing perspective of a new roadway between tent 3 and tent 4 on the west campus of Stony Brook University. Pictured in the distance is the Sports Complex (center). Pictured to the far right is tent 5.Date: 2020-06-09 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Northside of tent 3 and a newly paved asphalt roadway on the west campus of Stony Brook University.Date: 2020-06-19 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
South-facing perspective of tent 5 on the west campus of Stony Brook University.Date: 2020-06-19 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Entrance on the west side of tent 5 on the west campus of Stony Brook University.Date: 2020-06-19 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
West side of tent 5 with attached HVAC equipment on the west campus of Stony Brook University.Date: 2020-06-19 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Walkway located between tent 1 and tent 2 as seen through a chain-link fence on Circle Road on the west campus of Stony Brook University.Date: 2020-06-19 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Signage for ambulance access located on Circle Road by the entrance to tent 2 at the Alternate Care Facility (ACF)/COVID-19 field hospital on the west campus of Stony Brook University.Date: 2020-06-19 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Signage at the entrance of the Alternate Care Facility (ACF)/COVID-19 field hospital on the west campus of Stony Brook University.Date: 2020-04-07 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
West-facing perspective of tent 3 on the west campus of Stony Brook University. This building is located north of the Kenneth P. LaValle Athletic Stadium. The L.I.R.R. station is situated to the west. The asphalt road was added for access.Date: 2020-04-07 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Tent 1 and tent 2 on the west campus of Stony Brook University.Date: 2020-04-07 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Tent 1 under construction on the west campus of Stony Brook University.Date: 2020-04-07 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Delivery of supplies on Circle Road by tent 1 on the west campus of Stony Brook University.Date: 2020-04-07 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 2 on the west campus of Stony Brook University. Pictured in the background is tent 1.Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Northeast-facing perspective of Circle Road near the L.I.R.R. station and tent 2 on the west campus of Stony Brook University. Pictured in the background is tent 1.Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 5 on the west campus of Stony Brook University. Pictured in the background is the Chemistry building (left) and Sports Complex (center).Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 4 on the west campus of Stony Brook University. Pictured in the background is the Kenneth P. LaValle Athletic Stadium (left), Chemistry building (right), and Sports Complex (right).Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 3 and tent 4 on the west campus of Stony Brook University. Pictured in the background is the Chemistry building (left), Sport Complex (center), Physics building (right) and Math Tower (right).Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 3 and tent 4 on the west campus of Stony Brook University. Pictured in the background is the Chemistry building (left), Physics building (right) and Math Tower (right).Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 3 on the west campus of Stony Brook University. Pictured in the background is Kenneth P. LaValle Athletic Stadium.Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 2 on the west campus of Stony Brook University.Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 1 on the west campus of Stony Brook University.Date: 2020-04-04 -
Construction of the Alternate Care Facility (ACF)/COVID-19 field hospital.
Construction site of tent 1 and tent 2 by Circle Road on the west campus of Stony Brook University.Date: 2020-04-04